This spec is not available in the specification table.
Brinell Hardness
80 to 100 BHN
This spec is not available in the specification table.
Series
ERCuSi-A
This spec is not available in the specification table.
For Material Type
Copper to Copper, Copper-Silicon to Copper-Zinc, Copper-Zinc to Copper-Zinc, Copper-Silicon to Copper-Silicon, Copper to Copper-Silicon, Copper to Copper-Zinc
This spec is not available in the specification table.
Standards
AWS A5.7
This spec is not available in the specification table.
Deskripsi Produk
Enquire us
Get a tailor-made quotationto match with your requirements.
Kuantitas:
EA
MOQ dari 2 EA
Paket 1 EA
Lead time diperlukan 20 hari kerja.
Barang akan siap dikirim dalam waktu tenggang yang ditentukan.